Concrete Crack of Ballastless Track Structure and its Repair Xie Yongjiang*/Li Huajian*/Feng Zhongwei*/Lee Ilwha**
International Journal of Railway, vol. 2, no. 1, pp.30-36, 2009
Abstract : Crack and its damage of structure concrete in both FBS and TBS ballastless track are presented. The cause of concrete
crack is analyzed. According to corresponding quantitative equation, effective technical measures to depression crack of
concrete are put forward, at the same time the rationality of elastic ratio for HGT has been proved. At last, by the analysis
of the characteristic of high-speed train, which are serving in the open air, bearing fatigue load, the short time for
maintenance window and high speed of service, technical requirement for concrete repair material, repair technology and
repair tools of ballastless track structure are presented.
Keyword :
Ballastless track, Concrete, Crack, Repair
|